Share the installation steps of LCD splicing screen
Release time:2019-11-28
When installing the LCD splicing screen, the base should be connected from the first group on the left to the right (from left to right), then the cabinet should be installed from the first group on the left to the right (from left to right), followed by the installation of the face frame, and finally the aluminum profile accessories that fix the LCD splicing screen display unit should be connected, with 2 fixed in each column. After installing the cabinet, assemble all components of the cabinet according to the project drawings and confirm that they are firm and stable.